★★★★★ 4.9/5 Rated
🛡️ 10-Year Guarantee
🚚 Free UK Delivery
📍 20,000+ Mattresses Since 1985
Need help choosing your options? Call us on 0121 663 6114 — we're here to help. 📞 0121 663 6114 💬 WhatsApp 07769 431 970
Size & Shape
Mattress
3
Order
Skip to product information
1 of 4

SKU:BodyS109

Bodyshape Right S Curve Caravan Mattress - Single

Bodyshape Right S Curve Caravan Mattress - Single

Regular price £349.00
Regular price Sale price £349.00
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Measurements

Enter your measurements below then click Save Measurements

Quick measuring reference

Place your order and send your measurements afterwards — email us at hello@caravanmattresses.co.uk or WhatsApp us on 07769 431 970 with your order number and we'll take care of the rest.

Too complex to measure? We'll send you a free measuring kit — craft paper, marker and a prepaid return envelope. Trace your shape and post it back — we'll do the rest.

Sent once your mattress order is placed · Completely free · Arrives within 1–2 working days

Vehicle Details

Optional but helpful — the more detail you provide, the better we can match your mattress

Handmade in Britain
40+ Years Experience
Free UK Delivery
Handmade in Britain Every mattress cut & sewn in Birmingham
40+ Years Experience Family-run manufacturer since 1982
Free UK Delivery Fast turnaround times
Our customers say Excellent
5.0 — 110 reviews Reviews.io
View full details

Bodyshape™ Mattress

Premium Vasco™50 memory foam for personalised pressure relief and superior motion isolation

Bodyshape™ Mattress
  • 3 firmness levels: Medium, Firm Orthopaedic, Hard
  • Depths from 15–25 cm
  • 5-year guarantee
  • TENCEL® zip-off washable cover
  • Premium Vasco™50 memory foam
  • Triple-layer construction
  • Lightweight design
  • Excellent motion isolation for couples

Triple-Layer Construction
Bodyshape™ triple-layer construction diagram
  1. TENCEL® Zip-Off Cover

    Superior moisture-wicking and temperature regulation. Easy to remove and machine wash.

  2. Vasco™50 Memory Foam Top Layer

    Moulds to your body shape for personalised pressure relief and motion isolation.

  3. Adaptive Support Layer

    Responds to movement whilst maintaining proper spinal alignment. Bridges the comfort layer with the foundation.

  4. Premium Foundation Layer

    Provides stability and durability in a lightweight construction.

Why Choose Bodyshape™?

The Bodyshape™ features Vasco™50 memory foam that moulds to your body shape for targeted pressure relief — a significant step up from the budget memory foams used by many competitors.

Its triple-layer construction delivers excellent motion isolation, making it ideal for couples, whilst adapting to your individual sleep needs.

Ideal for:

  • Couples wanting minimal sleep disturbance
  • Those with pressure points needing targeted relief
  • Side sleepers seeking body-contouring support
  • Anyone requiring orthopaedic support with comfort
Firmness & Depth Options

Firmness Levels

Medium

Personalised contouring with balanced support

Firm Orthopaedic

Enhanced spinal alignment and therapeutic support

Hard

Maximum support with targeted pressure relief

Available Depths

15 cm

Compact comfort for tighter spaces. Supports up to 15 stone (95 kg).

20 cm

Optimal balance of contouring and support. Supports up to 20 stone (127 kg).

25 cm

Maximum luxury and pressure relief. Supports up to 25 stone (159 kg).

All depths available in Medium, Firm Orthopaedic, and Hard. For weights above 25 stone, please contact us for bespoke options.

Care & Maintenance

Mattress

  • No-flip design — one-sided use with a marked sleeping surface
  • Rotate head-to-foot periodically for even wear
  • Allow ventilation; use a mattress protector
  • No special maintenance required for the foam layers

TENCEL® Cover

  • Machine wash at 30 °C on a gentle cycle
  • Use mild liquid detergent — no bleach
  • Air dry only
  • Iron on low if needed
  • Wash every 1–2 months
Measuring Guide

We always recommend reducing your order size by a couple of centimetres to allow room for tucking in bedding, though this remains a personal preference.

Delivery
  • Free delivery to most addresses in England, Scotland, and Wales
  • Rolled and vacuum-packed in a 158 × 39 × 39 cm box for easy handling
  • Lead time typically 7–14 days depending on demand and production capacity

Specific mattress weights are available on request.

Frequently Asked Questions
How does Vasco™50 memory foam work?
It uses your body heat to mould to your shape, providing personalised support that standard budget foams cannot match.
How good is the motion isolation?
Excellent — the Vasco™50 construction absorbs movement so your partner won't disturb you.
How long does a rolled mattress take to expand?
2–4 hours for basic expansion; allow 24–48 hours for the foam to fully activate.
What's included?
The mattress with TENCEL® zip-off cover, care instructions, and a 5-year guarantee.
Is the Firm Orthopaedic option suitable for everyday use?
Absolutely — it's designed for therapeutic support whilst remaining comfortable for all sleeping positions.

5-Year GuaranteeQuality assured, built with confidence