β˜…β˜…β˜…β˜…β˜… 4.9/5 Rated
πŸ›‘οΈ 10-Year Guarantee
🚚 Free UK Delivery
πŸ“ 20,000+ Mattresses Since 1985
Need help choosing your options? Call us on 0121 663 6114 β€” we're here to help. πŸ“ž 0121 663 6114 πŸ’¬ WhatsApp 07769 431 970
Size & Shape
Mattress
3
Order
Skip to product information
1 of 4

SKU:NovoK109

Novolatex Right S Curve Caravan Mattress - King

Novolatex Right S Curve Caravan Mattress - King

Regular price Β£476.10
Regular price Β£529.00 Sale price Β£476.10
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Measurements

Enter your measurements below then click Save Measurements

Quick measuring reference

Place your order and send your measurements afterwards β€” email us at hello@caravanmattresses.co.uk or WhatsApp us on 07769 431 970 with your order number and we'll take care of the rest.

Too complex to measure? We'll send you a free measuring kit β€” craft paper, marker and a prepaid return envelope. Trace your shape and post it back β€” we'll do the rest.

Sent once your mattress order is placed Β· Completely free Β· Arrives within 1–2 working days

Vehicle Details

Optional but helpful β€” the more detail you provide, the better we can match your mattress

Handmade in Britain
40+ Years Experience
Free UK Delivery
Handmade in Britain Every mattress cut & sewn in Birmingham
40+ Years Experience Family-run manufacturer since 1982
Free UK Delivery Fast turnaround times
Our customers say Excellent
5.0 — 110 reviews Reviews.io
View full details

Novolatexβ„’ Mattress

Laytecβ„’ responsive support with spring-like bounce back β€” faster recovery than memory foam

Novolatexβ„’ Mattress
  • 3 firmness levels: Medium, Medium Firm Orthopaedic, Hard
  • Depths from 15–25 cm
  • 5-year guarantee
  • Cloudβ„’ sculptured zip-off cover
  • Laytecβ„’ responsive comfort β€” rebounds faster than memory foam
  • Triple-layer construction
  • Targeted pressure relief with adaptive support
  • Lightweight design

Triple-Layer Construction
Novolatexβ„’ triple-layer construction diagram
  1. Cloudβ„’ Zip-Off Cover

    Soft sculptured cloud-like design with hypoallergenic materials. Easy to remove and machine wash.

  2. Pressure-Relieving Top Layer with Laytecβ„’

    Targeted pressure relief with spring-like responsiveness. Rebounds and recovers faster than memory foam.

  3. Adaptive Supportive Layer

    Responds to movement whilst maintaining proper spinal alignment. Works with the Laytecβ„’ layer for optimal comfort balance.

  4. Premium Foundation Layer

    Exceptional stability and durability in a lightweight construction.

Why Choose Novolatexβ„’?

The Novolatexβ„’ features Laytecβ„’ technology that delivers spring-like bounce back and rebounds faster than traditional memory foam. It adapts instantly to movement, making it ideal for restless sleepers and those who find memory foam too slow to respond.

The triple-layer construction combines a pressure-relieving top layer with an adaptive supportive layer for optimal spinal alignment and targeted comfort.

Ideal for:

  • Those seeking responsive comfort that adapts quickly to movement
  • People who prefer faster recovery than traditional memory foam
  • Couples needing motion isolation with enhanced responsiveness
  • Anyone requiring orthopaedic support with responsive comfort
Firmness & Depth Options

Firmness Levels

Medium

Balanced comfort with gentle contouring

Medium Firm Orthopaedic

Therapeutic support with Laytecβ„’ responsiveness

Hard

Maximum support with responsive bounce back

Available Depths

15 cm

Compact Laytecβ„’ responsive comfort for tighter spaces.

20 cm

Optimal balance of pressure relief and adaptive support.

25 cm

Maximum comfort with full triple-layer construction.

All depths available in Medium, Medium Firm Orthopaedic, and Hard. Suitable for a wide range of body weights.

Care & Maintenance

Mattress

  • No-flip design β€” one-sided use with a marked sleeping surface
  • Rotate head-to-foot periodically for even wear
  • Laytecβ„’ foam maintains its bounce back with minimal maintenance
  • Naturally resistant to dust mites

Cloudβ„’ Cover

  • Machine wash at 30 Β°C on a gentle cycle
  • Use mild liquid detergent β€” no bleach
  • Air dry only
  • Iron on low if needed
  • Wash every 1–2 months
Measuring Guide

We always recommend reducing your order size by a couple of centimetres to allow room for tucking in bedding, though this remains a personal preference.

Delivery
  • Free delivery to most addresses in England, Scotland, and Wales
  • Rolled and vacuum-packed in a 158 Γ— 39 Γ— 39 cm box for easy handling
  • Lead time typically 7–14 days depending on demand and production capacity

Specific mattress weights are available on request.

Frequently Asked Questions
How does Laytecβ„’ technology work?
It's an advanced responsive layer that rebounds faster than memory foam, providing spring-like bounce back with targeted pressure relief.
What's the benefit of faster recovery?
Superior responsiveness to movement and reduced heat retention β€” the foam doesn't hold body heat the way traditional memory foam can.
How long does a rolled mattress take to expand?
1–2 hours for basic expansion; allow 12–24 hours for full performance activation.
What's included?
The mattress with Cloudβ„’ zip-off cover, care instructions, and a 5-year guarantee.
Is Medium Firm Orthopaedic suitable for everyday use?
Absolutely β€” it's designed for therapeutic support whilst maintaining responsive comfort for all sleeping positions.

5-Year GuaranteeQuality assured, built with confidence