★★★★★ 4.9/5 Rated
🛡️ 10-Year Guarantee
🚚 Free UK Delivery
📍 20,000+ Mattresses Since 1985
Need help choosing your options? Call us on 0121 663 6114 — we're here to help. 📞 0121 663 6114 💬 WhatsApp 07769 431 970
Size & Shape
Mattress
3
Order
Skip to product information
1 of 4

SKU:SwComfiK105

Swift Comfisan Left S Curve Caravan Mattress - King

Swift Comfisan Left S Curve Caravan Mattress - King

Regular price £429.00
Regular price Sale price £429.00
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness

Vehicle Details

Optional but helpful — the more detail you provide, the better we can match your mattress

Handmade in Britain
40+ Years Experience
Free UK Delivery
Handmade in Britain Every mattress cut & sewn in Birmingham
40+ Years Experience Family-run manufacturer since 1982
Free UK Delivery Fast turnaround times
Our customers say Excellent
5.0 — 110 reviews Reviews.io
View full details

Comfisan™ Mattress

Engineered orthopaedic support with Laytec™ responsive comfort and express delivery

Comfisan™ Mattress
  • 3 firmness levels: Medium-firm, Firm Orthopaedic, Hard
  • Depths from 15–25 cm
  • 5-year guarantee
  • TENCEL® moisture-wicking fixed cover
  • Laytec™ comfort layer — rebounds faster than memory foam
  • Multi-layer orthopaedic construction
  • Lightweight, no-flip design
  • Express delivery: 7–10 working days

Multi-Layer Construction
Comfisan™ multi-layer construction diagram
  1. TENCEL® Fixed Cover

    Naturally hypoallergenic with excellent moisture-wicking and temperature regulation.

  2. Laytec™ Pressure-Relieving Top Layer

    Responsive comfort that conforms to your body whilst maintaining spinal alignment. Rebounds faster than memory foam.

  3. Premium Foundation Layer

    Engineered for orthopaedic stability and long-lasting support.

Why Choose Comfisan™?

The Comfisan™ combines engineered orthopaedic support with a Laytec™ comfort layer that rebounds and recovers faster than memory foam, giving you responsive pressure relief without the slow-sink feeling.

Its multi-layer construction delivers excellent support whilst remaining lightweight and easy to handle, with express delivery in just 7–10 working days.

Ideal for:

  • Those seeking orthopaedic support for back or joint concerns
  • Hot sleepers needing temperature regulation
  • Anyone wanting responsive comfort that doesn't sink
  • Those needing a mattress quickly with express delivery
Firmness & Depth Options

Firmness Levels

Medium-firm

Balanced orthopaedic support with gentle pressure relief

Firm Orthopaedic

Enhanced support for optimal spinal alignment

Hard

Maximum orthopaedic support for therapeutic sleep

Available Depths

15 cm

Compact orthopaedic support. Supports up to 15 stone (95 kg).

20 cm

Optimal balance of comfort and support. Supports up to 20 stone (127 kg).

25 cm

Maximum therapeutic comfort. Supports up to 25 stone (159 kg).

All depths available in Medium-firm, Firm Orthopaedic, and Hard. For weights above 25 stone, please contact us for bespoke options.

Care & Maintenance

Mattress

  • No-flip design — one-sided use with a marked sleeping surface
  • Rotate head-to-foot periodically for even wear
  • Allow ventilation; use a mattress protector
  • Hypoallergenic construction resists dust mites naturally

TENCEL® Fixed Cover

  • Spot clean with mild detergent and water
  • Allow to air dry completely
  • Use a mattress protector for added care
  • Professional cleaning if required
Measuring Guide

We always recommend reducing your order size by a couple of centimetres to allow room for tucking in bedding, though this remains a personal preference.

Delivery
  • Free delivery to most addresses in England, Scotland, and Wales
  • Rolled & Boxed: vacuum-sealed in a 158 × 60 × 60 cm carton
  • Full Size: delivered ready to use with no compression
  • Express delivery 7–10 working days, but usually ships quicker

Specific mattress weights are available on request.

Frequently Asked Questions
Why does the Comfisan™ have a fixed cover?
Fixed covers provide seamless aesthetics and enhanced durability.
How long does a rolled mattress take to expand?
Around 60 minutes to a few hours for full expansion.
What's included?
The mattress with TENCEL® fixed cover, care instructions, and a 5-year guarantee.
Is it suitable for adjustable beds?
Yes — the flexible construction adapts to adjustable base positions whilst maintaining orthopaedic support.
How fast is express delivery?
7–10 working days including production and shipping, but it usually arrives sooner.

5-Year GuaranteeQuality assured, built with confidence