β˜…β˜…β˜…β˜…β˜… 4.9/5 Rated
πŸ›‘οΈ 10-Year Guarantee
🚚 Free UK Delivery
πŸ“ 20,000+ Mattresses Since 1985
Need help choosing your options? Call us on 0121 663 6114 β€” we're here to help. πŸ“ž 0121 663 6114 πŸ’¬ WhatsApp 07769 431 970
Size & Shape
Mattress
3
Order
Skip to product information
1 of 4

SKU:SwImperial2000D105

Swift Imperial Elite 2000 Left S Curve Caravan Mattress - Double

Swift Imperial Elite 2000 Left S Curve Caravan Mattress - Double

Regular price Β£829.00
Regular price Sale price Β£829.00
Sale Sold out
Choose Mattress Firmness
Mattress Delivery

Vehicle Details

Optional but helpful β€” the more detail you provide, the better we can match your mattress

Handmade in Britain
40+ Years Experience
Free UK Delivery
Handmade in Britain Every mattress cut & sewn in Birmingham
40+ Years Experience Family-run manufacturer since 1982
Free UK Delivery Fast turnaround times
Our customers say Excellent
5.0 — 110 reviews Reviews.io
View full details

Imperial Eliteβ„’ 2000 Mattress

Flagship luxury hybrid β€” 2000 pocket springs with Vascoβ„’60 memory foam and ReVoβ„’ cool gel technology

Imperial Eliteβ„’ 2000 Mattress fitted inside a Buccaneer Cruiser Caravan
  • 2000 individually wrapped pocket springs
  • 3 firmness levels: Medium, Firm Orthopaedic, Hard
  • 25 cm depth β€” single premium specification
  • 10-year guarantee
  • Luxury smooth cashmere blend cover, half-tufted
  • ReVoβ„’ cool gel breathable comfort layer
  • Vascoβ„’60 premium memory foam
  • Reinforced edge support system
  • Supports up to 35 stone (222 kg)
  • Lightweight β€” king size under 25 kg

Seven-Layer Construction
Imperial Eliteβ„’ 2000 seven-layer construction diagram
  1. Luxury Smooth Cashmere Blend Cover

    Exceptional softness with natural hypoallergenic properties. Half-tufted for enhanced durability.

  2. ReVoβ„’ Cool Gel Breathable Comfort Layer

    Advanced cool gel technology for optimal temperature regulation and enhanced breathability.

  3. Vascoβ„’60 Memory Foam Support Layer

    Premium-grade memory foam delivers superior body contouring, pressure relief, and motion isolation.

  4. Transition Foam Layer

    Seamless integration between the memory foam comfort layers and the pocket spring system below.

  5. Half-Tufted Construction

    Secures the spring system whilst maintaining a smooth, luxurious sleeping surface. Prevents layer shifting.

  6. 2000 Pocket Spring System

    Individually wrapped springs provide ultra-responsive, personalised support with exceptional motion isolation.

  7. Reinforced Edge Support System

    Maximises usable sleeping surface and prevents edge sagging for consistent support across the entire mattress.

Why Choose Imperial Eliteβ„’ 2000?

Our flagship mattress combines precision 2000 pocket spring engineering with Vascoβ„’60 memory foam and ReVoβ„’ cool gel technology β€” all finished with a luxury smooth cashmere blend cover for an unparalleled sleep experience.

Each of the 2000 individually wrapped springs responds independently, delivering ultra-responsive support with exceptional motion isolation. The half-tufted construction and reinforced edge support system ensure lasting structural integrity.

Ideal for:

  • Those seeking the finest hybrid construction available
  • Couples needing outstanding motion isolation
  • Anyone who appreciates cashmere luxury with pocket spring responsiveness
  • Those requiring orthopaedic support in a premium package
Firmness Options

All firmness levels are available at 25 cm depth and support up to 35 stone (222 kg).

Medium

Luxurious pocket spring comfort with cashmere softness

Firm Orthopaedic

Therapeutic pocket spring support with premium comfort

Hard

Maximum pocket spring support with precision engineering

All firmness levels available at 25 cm depth. Supports up to 35 stone (222 kg).

Care & Maintenance

Mattress

  • No-flip design β€” one-sided use with a marked sleeping surface
  • Rotate head-to-foot periodically for even wear
  • 2000 pocket springs require no special maintenance
  • Edge support and motion isolation remain consistent over time

Cashmere Blend Cover

  • Spot clean with mild detergent for minor marks
  • Half-tufted construction maintains its finish permanently
  • Naturally hypoallergenic
Measuring Guide

We always recommend reducing your order size by a couple of centimetres to allow room for tucking in bedding, though this remains a personal preference.

Delivery
  • Free delivery to most addresses in England, Scotland, and Wales
  • Rolled & Boxed: vacuum-sealed in a 158 Γ— 60 Γ— 60 cm carton
  • Full Size: delivered ready to use with no compression
  • Lead time typically 7–14 days depending on demand and production capacity

Specific mattress weights are available on request β€” king size is under 25 kg.

Frequently Asked Questions
What makes this the flagship mattress?
It combines 2000 pocket springs, Vascoβ„’60 memory foam, ReVoβ„’ cool gel, and a cashmere blend cover in a seven-layer hybrid construction β€” our most advanced specification.
How do 2000 pocket springs improve comfort?
Each spring responds independently, delivering ultra-responsive support tailored to your body whilst providing exceptional motion isolation for couples.
What is the cashmere blend cover like?
Smooth, naturally soft, and hypoallergenic with a half-tufted finish that maintains its quality permanently.
How long does a rolled mattress take to expand?
2–4 hours for expansion β€” the pocket springs respond immediately. Allow 24–48 hours for full settling.
What's included?
The mattress with luxury cashmere blend cover, care instructions, and a 10-year guarantee.
Is this your highest weight capacity?
Yes β€” the 2000 pocket spring system supports up to 35 stone (222 kg). For heavier requirements, contact us for bespoke options.

10-Year GuaranteeQuality assured, built with confidence